I am just writing to inform you that we will be carrying out tidal working at the Islington Pumping Station site for the next month on the outfall structure piling and excavation.
This will necessitate us beginning work later in the day and will result in our working day finishing early evening. We shall of course endeavour to finish as early as possible in the evenings. This should hopefully have minimal impact on the local residents.
All impact hammer works will be limited as much as possible and we have employed a ‘silent piler’ to carry out the work (as pictured) – this uses a hydraulic press to install the piles and therefore noise and vibration should be virtually undetectable.
Again, we will do everything within our power to ensure that these works cause minimum disruption to the local community. I have sent a post out on the Next Door site advising everyone of the works and thanking them all for their continued support, as well as apologising for any inconvenience caused.
Work on site is continuing to progress well